This entry was posted on Tuesday, May 24th, 2005 at 12:00 pm and is filed under Uncategorized, WorkLists, Diary. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.
Have put the bill in to maitland for 1 of the mock designs and for the updates that is now finished, website redesign and summaries database still to do. Also the automation of the update process may be a project in the pipe line.
TO DO LIST
Lunar arcade (is moved to new server have to ask Atif best way to move forward 90% done)
Finish off all blogs (Need: Design, 3 linking programmes(need code), bottom links perhaps second side links(internal linking))
Finished script (Dan has been asked for them)
Adword for dating site plus aquila
Design for invoice
Design for the login control panel.
List that the control panel needs to do.